The upcoming permanent site at 446 York St. has been in the works since 2018 and survived local opposition, along with a failed attempt to appeal its rezoning.
London’s supervised consumption site aims to open no later than March 2022


The upcoming permanent site at 446 York St. has been in the works since 2018 and survived local opposition, along with a failed attempt to appeal its rezoning.